Constellation
- Deck SMART (TM)![]()
Newbuilds
Home |
Virtual Tour |
Overview
| Deck SMART | Wellhead
SMART | Specifications | Construction Photos
A jackup, enabling tomorrow's efficiencies
The Deck SMART (TM) system moves stand make-up off the critical path by safely transferring the work to the cantilever deck. The automated system takes advantage of the Constellation’s 108 ft long cantilever deck, which enables triple stands of drill pipe and doubles of casing to be made up on the cantilever and passed safely and efficiently to the drill floor.
|
||||||
![]() |
MAKE UP AND BREAK OUT A knuckle boom crane located on the cantilever deck feeds single joints to the automated tubular stand make-up and break-out machine which builds stands of drill pipe or casing horizontally on the cantilever deck. The use of the knuckle boom crane in conjunction with this automated system significantly minimizes risk to personnel.
|
|||||
|
||||||
![]() |
STAND
ELEVATOR SYSTEM
Once complete, the stands are either stacked on the cantilever deck or moved
to the catwalk where the Horizontal To Vertical (HTV) pipe elevator transfers
the stands to the drill floor.
The HTV has the capacity to lift two stands of casing or drill pipe at any one time. |
|||||
|
||||||
![]() |
STARRACKER Once in the derrick the StarRacker pipe-handling system removes the stands from the HTV and transfers them to the setback area or direct to the well center. The HTV then returns to the horizontal position and collects the next pair of stands. | |||||
|
||||||
| The Deck SMART (TM) system offers considerable performance improvement over running casing in singles from the deck and also reduces the risk to drill floor personnel by eliminating manual handling and reducing the level of drill floor activity. | ||||||
Page last modified:
April 21, 2003
© 2003 GlobalSantaFe Corporation. All rights reserved.