Constellation - Wellhead SMART (TM)
Newbuilds Home | Virtual Tour | Overview | Deck SMART | Wellhead SMART | Specifications | Construction Photos

 

  BOP Forklift
The BOP forklift is a 125ton bridge crane that moves longitudinally and transversely and is equipped with a set of hydraulic telescoping forks that move vertically. These forks engage the BOP under the annular on a specially designed lifting ring.
  • The BOP forklift allows the BOP to be placed anywhere within the drilling envelope in a safe and efficient manner.
  • The forklift can lift the BOP with the overshot in place increasing efficiency when setting casing slips.
  • The forklift is designed for the adaptation of a workbasket.
    STORAGE/TEST AREA The storage/test area is a clean dry area separate from the cellar deck.
 

Storage / Test Area
The storage/test area is a clean dry area separate from the cellar deck.

  • This area is equipped with a portable test unit and a 30-ton overhead crane to assist with the assembly/disassembly of the BOP stack.
  • 13 x 13 ft access hatches allow BOP and subsea equipment to be placed in this area by the deck cranes.
  • Space to handle and assemble subsea trees. Note the subsea tree shown in the storage test area is for illustrative purposes only.
  • Two retractable storage stump platforms enable safe and efficient transfer of the BOP/subsea tree to the cellar deck.
  • Location of storage test area enables full access irrespective of rotary position.
 

BOP
Hydril 18 3/4” 10,000 psi BOP Stack (rated for H2S service).

  • Single stack compared to two stacks reduces BOP handling and nippling up/down times.
  • A MUX controls system enables improved shut in times, and further reduces nipple up times.
  • BOP/choke and kill upgradeable to 15,000 psi with minimum modification.
  • The BOP is fitted with work platforms that enable safe and easy maintenance.
  CONDUCTOR TENSIONING UNIT (CTU)
The CTU consists of eight hydraulic cylinders below the connector-lifting ring, which provide up to 600 kips tension. An additional 300 kips secondary tension can be supplied from above.
  • Ability to hold tension anywhere within the drilling envelope.
  • 900 kips enables us to maintain tension on the conductor pipe when drilling subsea templates or in deepwater (400 ft) locations.
  • Supplies tension from underneath leaving room to tension the stack from above.
  CONDUCTION TENSIONER PLATFORM (CTP)
The CTP is an enclosed support structure suspended below the cantilever for the CTU.
  • Provides a safe working environment by eliminating all over open water operations.
  • Splitable deck panels allow subsea templates and trees to be run from the rig.
  • Designed to accept four winches, which can be used as guidelines for sub sea work.