It is conservatively estimated that the Development Driller will save
approximately 20% in overall time on a typical West Africa well in 1,500
meters of water.
|
Increasing
Efficiency at Every Step in the Process
Increasing efficiency
is a key component to delivering more cost effective deepwater drilling solutions,
and the Development Driller has been specially designed to be the industry’s
most efficient deepwater development drilling rig.
EFFICIENCY
BEGINS WITH the Development Driller’s ability to arrive
on location with all required materials on board and begin operations immediately
in a dynamically positioned mode while the mooring spread is being laid. Two
independent load paths, each having heave compensation and rotational capability,
allow concurrent drilling and casing activity in the top hole section, and enable
the BOP and riser to be run while the top hole section is being completed.
SAFE
AND EFFICIENT offline tubular stand building and racking is
assured as each load path is equipped with its own handling system with the
ability to transfer tubulars to the other load path.
A
NUMBER OF ADDITIONAL key features ensure both efficiency and
more cost effective operations at every step of multi-well development.
- The
200 ft clear derrick height allows quad drilling tubulars and casing trebles
to reduce trip time, casing running time and drilling time.
-
|
CATWALK MACHINES
Tubulars are stored aft of the well activity centre and the
automated tubular and riser catwalk equipment enables simultaneous
pickup or laydown operations with minimum human intervention, reducing
exposure to risk.
|
The set back has
the capacity to rack a full string of casing which also reduces casing times
because the casing can be racked back in trebles while the hole is being drilled.
- A separate BOP/riser
hang-off cart with the capacity to support the fully deployed BOP and riser
at the end of the moonpool provides maximum separation between the riser and
tree running string. This reduces the risk of interference and allows subsea
trees to be run with the auxiliary hoist without recovering the BOP and riser.
- High
capacity drilling equipment including a Hydralift HDS-1000 2 E AC topdrive,
three 2,200 hp mud pumps plus a 2000 hp auxiliary pump, large bore high pressure
mud piping, optimized solids control equipment including two gumbo conveyors
followed by seven state-of-the-art high speed elliptical motion shale shakers.
-
|
RISER STORAGE
Up to 7500 ft of riser is stored vertically forward of the derrick
and can be run or retrieved on the main well centre independently
of tubular handling on the auxiliary well centre.
|
Dual mud systems
with a total surface capacity of 6,850 bbls, plus a further 12,200 bbls in
the columns, and a manifolding system that completely separates different
mud systems eliminates the down time associated with the change over between
oil based and water based mud during the drilling program.
- Dedicated deck
space and a 200 tonne gantry crane plus rig cranes sized to handle up to four
of the largest subsea trees also help eliminate non-productive time.
These features,
combined with a focus on well completion requirements from the outset of the
design, enable total efficiency from spud to bringing the well online.