Development Driller - Virtual Tour
Newbuilds Home | Virtual Tour | Overview | Mitigating Risk | Efficiency | Environment | Specifications | Construction Photos

 

 

  7,500 FT Vertical Riser Storage
  • Small deck footprint - more space available for other equipment
  • Improved BOP running times
  • Safer operation
  • Less buoyancy damage
Kvaerner Clip Riser
  • Easy make-up – no torque wrenches
  • Faster running times
  • Balmoral “Ultra-Float” buoyancy
  • 4-1/2” ID 15 K choke and kill lines
  • 6” ID 5 K boost line
  • Two 2” ID hydraulic lines
  Hydril 18-3/4” 15K BOP
  • 5 rams – space for 6 rams
  • Two 10K annulars
  • 10,000 ft fifth generation MUX system
  • ROV friendly
  • Vetco KFDS CSO diverter
  Large Moonpool
  • 140 ft X 28 ft clear opening
  • 400 tonne BOP elevator system
  • 700 tonne BOP and riser hang off cart
  • 3,000,000 lb riser tension
  Main Deck BOP Bridge Crane and Subsea Tree Storage
  • Better work area – space to handle up to 4 subsea trees
  • Dedicated BOP service gantry crane
  • Completion efficiency
  • Uncluttered moonpool
  High Set-back Capacity
  • 45,000 ft drillstring (fourbles)
  • 7,000 ft 13-3/8” casing (triples)
  • 900 tonnes capacity
  Station Keeping
  • DPS 2+ and 8 leg mooring system
  • Optional 12 or 16 point mooring system (for hurricanes)
  • Quicker hook-up to pre-set moorings
  • Safer boat operation
  • 5,000 tonne transit payload
  • Self propelled for infield moves
  18,000 FT2 Usable Deck Space
  • 7,000 tonne variable deck load (operating & survival)
  • Dedicated completions/well test area
  Dual Activity
  • Two load paths
  • Two top drives
  • Two active heave drawworks
  • Two iron roughnecks and pipe handlers
  Large Cranes
  • 100 tonnes @ 22m (full dynamic)
  • Can handle large subsea trees and coiled tubing units
  • Safer materials handling
  • Reserve capacity
  160 Man Quarters
  • Modern 1 and 2 man staterooms
  • Extensive offices and administrative spaces
  • Recreational facilities including gymnasium, training room and lounges
  High Effieciency Mud System
  • High pressure large bore mud piping
  • Optimized high capacity solids treatment equipment
  • Increased penetration rates
  • Capacity and flexibility to accommodate multiple mud systems
  • Quicker change-over to completions
  • Permanent piping system designed to accommodate completion equipment

 