Managing and mitigating risk to personnel, equipment and the well itself are all crucial to the success of any development program. Our desire to help operators better achieve these objectives was one of the key catalysts for designing our new Development Drillers. A primary objective of the design team was to provide a rig that, by good design, would minimize the risk exposure to rig personnel during all phases of the operation.

Main Deck Comparison
Main Deck Size Comparison and Development Driller Main Deck Drawing

The combination of large size, excellent motion characteristics and exceptionally large useable deck areas promotes a stable, spacious and safe working environment. Deck management issues are minimized by the ability to access the main working areas with more than one crane. Development Driller can withstand the fury of a hundred-year storm in the Gulf of Mexico with its sixteen point mooring system.

WITH 18,000 SQUARE FEET of usable deck space, more than 46,000 tonnes of operating displacement and more than 7,000 tonnes variable deck-load our Development Drillers have been specially engineered to provide an extremely stable and versatile work platform, making them the premier choice for controlling deepwater well construction risks.

DEVELOPMENT DRILLERS ARE DESIGNED to be conventionally moored in water depths up to 5,000 feet and with pre-set moorings can work in water depths up to and beyond 7,500 feet. The rig can be connected to a pre-set system without disconnecting its own anchors from the chain or removing them from the bolsters. This eliminates an operation that is potentially hazardous to personnel and substantially reduces the time required to connect to a pre-set system. The fact that the rig’s eight point mooring system can be supplemented by either an additional four or eight lines means that the rig can be secured on location to safely withstand a hundred-year Gulf of Mexico hurricane.

DEVELOPMENT DRILLER’S HIGH STABILITY reserves and ability to shift from operating to survival mode while maintaining a full deck load and pipe in the derrick eliminate the need to off-load equipment and supplies historically required to achieve survival mode. This greatly reduces the risk from an unexpected storm and minimizes the time required to prepare for and return to full operations once the storm has passed.

TO FURTHER MITIGATE RISK to personnel and equipment, our Development Drillers have been designed using only subsea equipment with a proven deepwater track record. Each rig features a vertically stored riser that is transferred between the drill floor and storage racks by a secure, two-point gantry crane system in order to minimize damage while dramatically improving riser running times. Breechlock riser connections also help speed riser makeup and minimize human contact.

IN ADDITION, the BOP is stored and maintained on the main deck and placed under the drill floor using an elevator system with a number of advanced features, including secure hydraulic cylinders. A “guided system” with key fail-safe features is used to run the BOP through the splash zone.


Development Driller can withstand the fury of a hundred-year storm in the Gulf of Mexico with its 16 point mooring system.

 

 