The New Fleet:  We got it right


Meeting the Challenges of Deepwater Development

Drilling and completing high quality production wells presents operators with a major set of challenges:

Specifically designed to help operators overcome these challenges, GlobalSantaFe’s new Development Driller is poised to revolutionize the process of drilling deepwater multi-well development drilling programs.

 

BOP STACK - The 18-3/4” 15K BOP stack is in a 5 ram configuration with the ability to increase to a 6 ram system. The BOP is transported in a robust and secure handling system that prevents uncontrolled movement of the BOP. Maintenance on the BOP is improved through a dedicated clean room for working on control pods and a 200 ton gantry crane allows safe handling of BOP components when the BOP is on the main deck, away from the open moonpool. Additionally, the BOP guide funnel can be released subsea, eliminating the need to bring the BOP to surface for removal.

 

FAIRLEADS - The Development Driller is equipped with an 8 point chain/wire mooring system for water depths up to 1500 meters. Additional fairleads and winch capability enable 12 or 16 mooring legs to be secured to pre-set moorings. If required by severe weather or an unexpected storm, the dynamic positioning system can be used to assist in maintaining station in all mooring configurations.

 

LIFE BOATS - Four 80 man freefall lifeboats located in pairs forward and aft allow personnel to evacuate the vessel in a rapid and safe manner.

 